13. 20/6/2019.Trampers. Deep Stream Pipeline from SH 87. M. Neil M. and Carol.
A fine but cool day dawned for the 10 trampers to depart for the big bend to start the Deep Stream walk to the East. Now just because it’s called a pipeline doesn’t mean it’s flat. Once the water is in the pipe the line goes up and down continually. In fact going by past reports for the distance we walked we climbed over 700 metres.

to the top of the first hill on the line in about 20 minutes, so a break was called for coffee and smoko.

After that, onwards and what do we find but the first big dip.


12. 22/6/2016. Trampers. Deep Stream Pipeline from SH 87. M. Leader: Neil M.
10 Trampers left Mosgiel at 9.30 am. It was somewhat cloudy with a very gentle breeze but pleasant conditions.
It was 10.10 am when we left the cars and from there an approximate 30 minute tramp before morning tea.
On a few occasions the pipeline and relief flues surfaced …


… whereby Peter gave us a lesson about hydraulics (water pressure and air bubbles) before disappearing again …

to wend its way …

… through stunning country of craggy rocks, sheep pastures, Deep Stream/Creek and even a lone, healthy hebe.
The many ‘ups’ were balanced out by ‘downs’ and that led us to a 12.30 pm lunch stop …

…from where we looked across to the Rock and Pillars on the west and the Kakanui hills to the north.
At 1.00 pm (after squeezing an extra 5 minutes out of our keen-to-get-going leader) we left the well-placed rock tables and seats and headed back by the same route.
11. 13/5/2015. Trampers. Deepstream/creek pipeline where it crosses Hiway 87.

10. 18/7/2012. 8 Trampers. Hindon-Deep Stream Pipeline. Half of full distance. Return. Medium.

Moving time 3hr 46min. – Ken (edited)


9. 9/7/2008. Trampers. Hindon Pipe Line from Highway 87 to Wallaces Ford Road. Easy+. Leaders: Ian, Ria
Permissions from Mt Gowrie Station, Strathview Station, Calder Station.


A better day couldn’t have been provided. We were in the centre of a strong high pressure system that provided clear, sunny skies, a warm calm, and a quiet peacefulness, broken only by a gaggle of garrulous gulls over Deep Stream and the occasional baaing of sheep, while the remains of the snow from earlier in the week defined the lee edges of gullies against green pastures and brown tussock tops, providing us with a glorious panorama (taking in Maungatua, Silver Peaks, Rock and Pillar, Kakanui ranges). Our route was open and easy to follow and the track was broad and grassy. We had interesting man-made features, ie the Deep Stream pipeline, to accompany us.
And we had 14 companions whose enjoyment of the day we could share.

Bliss. Except, that is, that vigorous debate about the means of ferrying ourselves and cars from start-point drop-off at Deep Stream Bridge on Highway 87 to finish-point collection 15km downstream at Wallaces Ford Road took up quite a bit of the ride. Bruce reminded us of the old puzzle about the ferryman who had to transport a fox, a hen and a sack of corn across the river only one at a time not leaving two together when one would be devoured. (We did solve it.) And except for the fact that we were also on a roller-coaster ride. The benched track we were following that was the access road for the construction of the pipeline looked to be horizontal from a distance, but of course, Deep Stream is appropriately named and its contributories have a similar character. So we sang, “And when they’re up they’re up, and when they’re down they’re down, and when they’re only halfway up, there’s still more up and down!” as we crossed the gullies.

But what a feat the pipeline is, bringing water 60km from Lammerlaws to Dunedin, with siphon after siphon traversing the deeply-incised landscape. So we admired the weather, the landscape, the engineering and our good fortune at being able to appreciate it all! Thanks to Ian and Ria, and to Ken who regrettably missed all but the recce. – Bob
8. 27/6/2007. Trampers. Deep Stream Bridge, Middlemarch Rod, Hindon Pipeline. Medium. Leaders: Arthur and Barbara.
7. 7/8/2002. Combined. Hindon Pipeline. Easy. Leaders: Ria L, Mary L, Joyce.
6. 8/3/2000. Deep Stream Pipe Line. Leaders: Bev H, Colleen, Pat.
5. 15/7/1998. Hindon Pipeline. Leaders: Bob H, Ian
4. 9/11/1995. Trampers. Hindon Pipeline. Medium. Leaders: Ria L, Catherine, Peg C, Judy C.
3. 2/8/1995. Deep Stream Pipeline from Middlemarch Road. Medium. Leaders: Ria L, Catherine, Doug and Mairie.
2. 20/5/1992. Deep Stream from Middlemarch Road. Average. Leaders: Ria L, Evelyn M, Catherine, Shirley McN
1. 25/10/1989. Deep Stream. Middlemarch Road. Average. Interesting country. Leaders: Ria, Mary McG, Mary Y, Hugh and Judith.

Great trip down memory lane. I worked on the pipeline doing surveying from Deepstream to Brockville in the 70s. The work was fun. One of the truck drivers had his vehicle run backwards – travelled several hundred and rolled over in Deepstream. The Survey involved checking into wooden hubs of a previous survey. The pipeline travelled through two small hills. This was very hard work to drill through and cold wet work in winter. A possible dam survey resulted in bad results as the soil was too porous.
Lots of beer and billiards at the local Hindon pub. Lots of sheep cast, mushrooms and rabbits.
An excellent commentary for the website, Graeme. Thank you.
Worked at Hindon station, those breather pipes took alot of lightning strikes in storms.
Thanks for the comment Marty. Presumably the pipes are not somewhere to be nearby in a thunderstorm! Cheers, Ross